Highway 9 bridge over Highway 1

Hwy. 9 over Hwy. 1, 15 km. east of Calgary, required the erection of 21 girders that were over 8 feet (2.5 m) deep, 140 feet (42.5 m) long, and approximately 76,000 lbs. (35,000 kg) each. Supreme Bridge Division was able to erect them in a single weekend. Staging the girders near site at a crane supplier’s yard allowed us to get the girders out of our yard and close to the site to provide continuous erection. Special thanks to Graham Construction for great work on providing traffic control and road detours during this process.